### 24-92 Bondings / Inspections
|
|
|
|
| Item | Ref |
|
|
|------|-----|
|
|
| Bondings Flightcontrols | 24-92-00-210-024-A |
|
|
|
|
|
|
SUBTASK 24-92-00-220-063-B
|
|
C. Inspection of the Elevator Bonding Leads
|
|
|
|
(1) During the inspection, if you cannot replace the bonding leads that are broken or damaged, the bonding lead installations that follow are satisfactory:
|
|
|
|
(a) Bonding lead installed near the elevator tip:
|
|
- If less than 25 percent of its strands are damaged.
|
|
|
|
(b) And for the other bonding leads installed on the elevator:
|
|
- If only one bonding lead is broken or has more than 25 percent of its strands damaged and the other bonding leads have less than 25 percen of their strands damaged.
|
|
|
|
(2) Replace all the remaining broken or damaged bonding leads in less than 24 months or 7500 flight hours or 5000 flight cycles (the one that occurs first).
|
|
|
|
## Battery Protect C/Bs
|
|
| PANEL | LOC | DESIGNATION | FIN |
|
|
| ----------- | --- | ------------------------------- | ----- |
|
|
| 2PB1(BAT-1) | | | |
|
|
| 105VU | A01 | FLT CTL/ELAC1/STBY SPLY | 16CE1 |
|
|
| 105VU | B01 | FLT CTL/SEC1/STBY SPLY | 22CE |
|
|
| 105VU | C01 | ELEC/CSM/G /EV AUTO/SPLY | 7XE |
|
|
| 105VU | D01 | ELEC/HOT BUS/701PP SPLY | 5PB1 |
|
|
| 105VU | E01 | ELEC/HOT BUS/701PP SPLY | 12PB1 |
|
|
| 105VU | F01 | ELEC/BAT REF/BCL1 | 9PB1 |
|
|
| 105VU | J01 | NAV/STBY/INST/BAT | 23FN |
|
|
| 2PB2(BAT-2) | | | |
|
|
| 105VU | A02 | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 |
|
|
| 105VU | C02 | ADIRS/ADIRU1/28VDC | 6FP1 |
|
|
| 105VU | D02 | ELEC/HOT BUS/702PP SPLY | 5PB2 |
|
|
| 105VU | E02 | ELEC/HOT BUS/702PP SPLY | 12PB2 |
|
|
| 105VU | F02 | ELEC/BAT REF/BCL2 | 9PB2 |
|
|
| 105VU | G02 | ELEC/STAT INV/CNTOR/CTL | 14XB |
|
|
| 106VU | B04 | CSM/G /EV/MAN/SPLY | 6XE |
|